Lenze DISCO−Variable speed drive Manual do Utilizador Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 44
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 22
Commissioning and operation
Before switching on
6
l
23
BA 11.5032−EN 3.0
6 Commissioning and operation
( Stop!
Commissioning of the drive only by qualified staff!
6.1 Before switching on
Check:
ƒ Is the mechanical fixing o.k.?
ƒ Are the electrical connections o.k.?
ƒ Are all rotating parts and surfaces that may become hot protected against contact?
ƒ For gearboxes with breathing:
– Is the plug removed from the breather screw?
) Note!
Rear−mounted gearboxes must have separate ventilation, ^ Operating
Instruction of the gearbox!
6.2 During operation
( Stop!
During running−in, raised temperatures may occur over a period of 2 − 8 hours.
ƒ During operation, check the drive periodically and take special care of:
– unusual noises or temperatures,
– leakages,
– loose fixing elements,
– the condition of the electrical cables.
ƒ If any interference should occur, proceed according to the troubleshooting list in
chapter 8. If the interference cannot be eliminated, please contact the Lenze Service.
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 43 44

Comentários a estes Manuais

Sem comentários