Lenze I/O system 1000 Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 44
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
Lenze · I/O system 1000 · commissioning guidelines for the PLC Designer · DMS 1.2 EN · 11/2012 · TD05 15
4 Mapping the real station structure in the »PLC Designer«
4.1 Creating a new project in the »PLC Designer«
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Go to the Standard project dialog window and select the "L-force Controller 3200 C Logic
(Lenze)" in the Device selection list.
In the PLC_PRG in selection list, you can additionally select a programming language:
Sequential function chart (SFC)
Instruction list (IL)
Continuous function chart (CFC)
Function block diagram (FBD)
Ladder diagram (LD)
Structured text (ST)
5. Confirm the selection by clicking OK.
Next steps:
The following chapters describe by means of examples how to add the available I/O system to the
device view of the »PLC Designer« depending on the fieldbus used:
Configuring the I/O modules at the backplane bus of the L-force Controller
Configuring I/O modules on the EtherCAT bus coupler module
Configuring I/O modules on the CANopen bus coupler module
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 43 44

Comentários a estes Manuais

Sem comentários