Lenze PROFIBUS Controller-based Automation Manual do Utilizador Página 46

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 55
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 45
9 Defining the minimum cycle time of the PLC project
9.2 Optimising the system
46
Lenze · Controller-based Automation · PROFIBUS® Communication Manual · DMS 4.3 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9.2 Optimising the system
How to optimise the system:
1. Use the menu command Online Login, or log in on the Lenze Controller with <Alt>+<F8>.
For this, the PLC program must be error-free.
With the log-in, the fieldbus configuration and the PLC program are loaded into the
Controller.
2. Check the task processing times.
3. Optimising the cycle times:
If technologically required, the cycle times of the remaining tasks with lower priorities
can be decreased.
Condition: No task with a low priority must assign more than 60 percent of the
corresponding cycle time in its task utilisation.
Vista de página 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 54 55

Comentários a estes Manuais

Sem comentários