Lenze E93ZWLX Manual do Utilizador Página 38

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 77
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 37
Installation of the E93ZWL air lock
Preparations at the top of the control cabinet
10
l
E93ZWLX DE/EN/FR 1.0
3.4.3 Fix air lock to controller and to top of control cabinet
2
1
0
3
4
5
4
5
93ZWL018
Self-cutting screw
Air lock
Spring washer M6
Mounting plate
Top of control cabinet
Hexagon socket screw M6 × 16 mm
z
Fix the air lock to the top of the control cabinet using 16 self-cutting screws.
z
Fix the air lock to the controller exactly at the illustrated points using 2 hexagon socket screws
and spring washers.
3.4.4 Ground air lock
0
1
2
3
1
2
4
3
93ZWL22
Top of control cabinet
Spring washer M6
Grounding conductor of control
c
a
b
i
n
e
t
(
n
o
t
p
a
r
t
o
t
h
e
i
t
e
m
s
Tooth lock washer M6
Hexagon socket screw M6 × 16 mm
ca
b
i
ne
t
(
no
t
pa
r
t
o
t
h
e
i
t
ems
supplied)
1. Ground the air lock exactly at the illustrated point of the controller using 1 hexagon socket
screw, spring washer and tooth lock washer.
2. Ground the air lock exactly at the illustrated point of the control cabinet using 1 hexagon
socket screw, spring washer, grounding conductor and tooth lock washer.
Show/Hide Bookmarks
Vista de página 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 76 77

Comentários a estes Manuais

Sem comentários