7.6.2 Commands in the “Insert” menu
7.6.2.1 Contact
Icon: Menu: InsertWContact Keyboard: <Ctrl>+<K>
Use this command to insert a contact in front of the position selected in the network.
• If the selected position is a coil or a connection link between contacts and coil, the new
contact is connected in series to the previous contacts.
The inserted contact is pre-assigned ”???”.
• Click this text to change it to the required constant or variable. Alternatively, use the Help
Manager (<F2>)todoso.
7.6.2.2 Parallel contact
Icon: Menu: InsertWParallel contact Keyboard: <Ctrl>+<R>
Use this command to insert a contact in parallel to the position selected in the network.
• If the selected position is a coil or a connection link between contact and coil, the new
contact is connected parallel to the previous contacts.
The inserted contact is pre-assigned ”???”.
• Click this text to change it to the required constant or variable. Alternatively, use the Help
Manager ( <F2> )todoso.
7.6.2.3 Coil
Icon: Menu: InsertWCoil Keyboard: <Ctrl>+<L>
Use this command to insert a coil parallel to the already existing coils.
• If the selected position is a connection between contacts and coils, the new coil will be the
last coil.
• If the selected position is a coil, the new coil will be inserted directly above it.
The coil is pre-assigned ”???”.
• Click the text to change it to the required variable. Alternatively, use the Help Manager (<F2>)
to do so.
7.6.2.4 Insert at organization unit
Icon: - Menu: InsertWInsert at organization unit
WInput
WOutput
WBox
WAssignment
Keyboard:
<Ctrl>+<U>
<Ctrl>+<A>
This submenu to the Insert menu contains commands to add further elements to an already
inserted organization unit with EN input.