Drive PLC Developer Studio
Program example
3-8
l
DDS EN 2.3
Process
The first interrogation establishes whether Q is already set to TRUE ( TRUE: timer running). [
Line 1
]
• If QisTRUE, we will not change the assignment of DELAY but instead call function block
DELAY without input (to check whether the time has already expired). [
Line 10
]
• If QisFALSE, we will set the variable IN in DELAY to FALSE and thus at the same time ET
to 0 and Q to FALSE.[
Line 4
]
All variables are now set to the desired initial status.
– Now save the time required from variable SETTIME in variable PT [
Line 5/6
], and call DELAY
with IN:= TRUE.[
Line 7
]
– In the function block DELAY , the variable ET will now be counted up until it reaches the
value SETTIME ; then Q will be switched to FALSE .
• The negated value of Q will be saved after every WAIT cycle in OK [
Line 14/15
]
• As soon as Q becomes FALSE, OK becomes TRUE.
The timer is complete.
3.2.7 The main program PLC_PRG
The organization unit PLC_PRG is the main program for calling the two function blocks WAIT and
TRAFFICLIGHT .
29.To edit the organization unit PLC_PRG, activate its editor window by selecting
Object Organizer,
tab
Organization units
and double-clicking PLC_PRG .
3.2.7.1 Declaration
To ensure that the function blocks created before can be used in PLC_PRG , it is necessary to declare
instances of these function blocks. The traffic light example requires two instances of the function
block TRAFFICLIGHT ( LIGHT1, LIGHT2) and one instance of the function block WAIT ( WAIT1).
30.Use the declaration editor to declare as local variable (between the keywords VAR and
END_VAR) the variables for the required instances.
3.2.7.2 Sequential function chart
The start-up diagram of an organization unit in SFC always consists of an action Init, a subsequent
transition Tra ns0 and a jump back to Init.