Lenze PLC Designer PLC Designer (R2-x) Manual do Utilizador Página 87

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 844
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 86
L-force | PLC Designer
We Write a Little Program
DMS 3.2 EN 02/2011 TD29 85
The first transition switches through when START is TRUE and all others switch
through when DELAY in OK produces TRUE, i.e. when the set time period is finished.
The steps (from top to bottom) receive the names Switch1, Green2, Switch2, Green1,
whereby Init of course keeps its Name. "Switch" should include a yellow phase, at
Green1 TRAFFICSIGNAL1 will be green, at Green2 TRAFFICSIGNAL2 will be green.
Finally change the return address of Init after Switch1. If you have done everything
right, then the diagram should look like in the following image:
Program SEQUENCE, First Expansion Level, Instruction Part
Now we have to finish the programming of the individual steps. If you doubleclick on
the field of a step, then you get a dialog for opening a new action. In our case we will
use IL (Instruction List).
Vista de página 86
1 2 ... 82 83 84 85 86 87 88 89 90 91 92 ... 843 844

Comentários a estes Manuais

Sem comentários